![](https://bricknhomes.com/wp-content/uploads/2023/12/packages.jpg)
We Offer three packages – Silver, Gold and Platinum.
Our Packages – Click Here for Details
Designs & Drawings
![](https://bricknhomes.com/wp-content/uploads/2023/12/Design-and-drawing.png)
Structure
![](https://bricknhomes.com/wp-content/uploads/2023/12/Structure.png)
Kitchen
![](https://bricknhomes.com/wp-content/uploads/2023/12/Kitchen.jpg)
Bathroom
![](https://bricknhomes.com/wp-content/uploads/2023/12/bathroom.jpg)
Doors & Windows
![](https://bricknhomes.com/wp-content/uploads/2023/12/doors-and-windows.jpg)
Painting
![](https://bricknhomes.com/wp-content/uploads/2023/12/painting.jpg)
Flooring
![](https://bricknhomes.com/wp-content/uploads/2023/12/flooring.jpg)
Electrical
![](https://bricknhomes.com/wp-content/uploads/2023/12/Electrical.jpg)
Miscellaneous
![](https://bricknhomes.com/wp-content/uploads/2023/12/Misc.jpg)
LIFT
![](https://bricknhomes.com/wp-content/uploads/2023/12/LIFT.jpg)
Waterproofing
![](https://bricknhomes.com/wp-content/uploads/2023/12/Waterproofing.jpg)
Home Automation – Safety and Security
![](https://bricknhomes.com/wp-content/uploads/2023/12/Homeautomation.jpg)
Cove /False Ceiling
![](https://bricknhomes.com/wp-content/uploads/2023/12/Cove.jpg)
Wardrobe
![](https://bricknhomes.com/wp-content/uploads/2023/12/Wardrobe.jpg)
Light and Fans
![](https://bricknhomes.com/wp-content/uploads/2023/12/Light-and-fans.jpg)
Notes
-Covered area should be a minimum of 3,000 sqft. Steel base rate assumed in this pricing is Rs 61,000 per tonne (including GST, FOR) for 12 mm bars.
-For every increase/decrease of Rs 1,000 per tonne beyond the threshold of significant change will lead to a pro-rata increase/decrease of Rs 5 in the per square foot rates for Covered Area, Semi-Covered Area and Below Ground Area and the Contract Value will be adjusted accordingly. Cement base rate assumed today is Rs 350 per bag (including GST, FOR)
-For every increase/decrease of Rs 10 per bag beyond the threshold of significant change will lead to a pro-rata increase/decrease of Rs 5 in the per square foot rates for Construction Area (sum of Covered Area, Semi Covered Area and Below Ground Area) and the Contract Value will be adjusted accordingly. This change will cater to the impact of cement price change for cement as well as RMC